|
[1] Agnetis, A., Murgia, G. and Sbrilli, S.(2013)A job shop scheduling problem with human operators in handicraft production. International Journal of Production Research, 52, 13, 3820-3831. [2] Asefeh, H.-G., Masound, R. and Neda, M.(2012)A novel mathematical model for manpower scheduling in break (relief) times in mixed model assembly lines. Procesia-Social and Behavioral Sciences, 62, 1371-1377. [3] Chang, A.K., Jiang, H.-Y., Di, Y., Zhu, D. and Ge, Y (2008)Time-line based model for software project scheduling with genetic algorithms. Information and Software Technology, 50, 1142-1154. [4] Lobo, B.J., Hodgson, T.J., King, R.E. and Thoney, K.A.(2013)Allocating job-shop manpower to minimize Lmax: Optimality criteria, search heuristics, and probabilistic qquality metrics. Computers and Operations Research, 40, 2569-2584. [5] Mencia, R., Sierra, M.R., Mencia, C. and Varela, R (2015)Memetic algorithms for the job shop scheduling problem with operators. Applied Soft Computing, 34, 94-105. [6] Pan, Q.-K., Suganthan, P.N., Chua, T.J. and Cai, T.X (2010)Solving manpower scheduling problem in manufacturing using mixed-integer programming with a two-stage heuristic algorithm. The International Journal of Advanced Manufacturing Technology, 46, 1229-1237. [7] Parisa, S.-S., Reza, T.-M. and Hamed, K.(2013)Solving a new fuzzy multi-objective model for a multi-skilled manpower scheduling problem by particle swarm optimization and elite tabu search. The International Journal of Advanced Manufacturing Technology, 64, 1517-1540. [8] Yoshimura, M., Fujimi, Y., Izui, K. and Nishiwaki, S (2006)Decision-making support system for human resource allocation in product development projects.International Journal of Production Research, 44, 5, 831-848. [9] Zouba, M., Baptiste, P., Rebaine, D.(2009)Scheduling identical parallel machines and operators within a period based changing mode. Computers and Operations Research, 36, 3231-3239. |