|
[1] 林則孟,系統模擬-理論與應用,滄海書局,2001 [2] 林則孟、邱俊智、陳宏銘,”粒子群演算法結合模擬於隨機性緩衝區容量分配問題”,2014中國工業工程學會學術研討會,台灣,2014 [3] 方信櫻,”半導體封裝廠之短期訂單與機台指派問題”,國立清華大學工業工程與工程管理學系,碩士論文,2013 [4] 黃謙研,”考慮批量流和集批加工之混合流程型生產排程問題-以半導體封裝廠為例”, 國立清華大學工業工程與工程管理學系,碩士論文,2014 [5] Azzi, Anna, Faccio, Maurizio, Persona, Alessandro and Sgarbossa, Fabio, Lot splitting scheduling procedure for makespan reduction and machine capacity increase in a hybrid flow shop with batch production, International Journal of Advanced Manufacturing Technology 59, pp 775-786, 2012 [6] Chen, CH. and Lee, LH., Stochastic Simulation Optimization: An Optimal Computing Budget Allocation, 2010. [7] Defersha, Fantahun M., A comprehensive mathematical model for hybrid flexible flowshop lot streaming problem, International Journal of Industrial Engineering Computations, vol.2, pp. 283–294, 2011 [8] El-Bouri, Ahmed, Balakrishnan, Subramaniam and Popplewell, Neil, Cooperative dispatching for minimizing mean flowtime in a dynamic flowshop, International Journal of Production Economics, vol.113, pp. 819-833, 2008 [9] Feldmann, M. and Biskup, D., Lot streaming in a multiple product permutation flow shop with intermingling, International Journal of Production Research, vol.46, No. 1, pp. 197–216, 2008 [10] Garey, M.R. and Johnson, D.S., Computers and intractability: a guide to the theory of NP-completeness, 1979. [11] Gupta, JND, Hariri, A.M.A. and Potts, C.N., Scheduling a two-stage hybrid flow shop with parallel machines at the first stage, Annals of Operations Research ,vol.69, pp.171-191, 1997 [12] Haupt R., A Survey of Priority Rule-Based Scheduling, OR Spektrum 11:3--16, 1989 [13] Henderson, Shane G. and Nelson, Barry L., Handbooks in Operations Research and Management Science: Simulation, Vol.13, Pages 1-678, 2006 [14] Holland, J. H., Adaptation in Natural and Artificial Systems, Cambridge, MA, First edition, 1975 [15] Hunsucker J.L. and Shah, J.R., Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment, European Journal of Operational Research ,vol.72, pp. 102-114, 1994 [16] Lin, James T., Chena, Chien-Ming, Chiua, Chun-Chih, Fanga, Hsin-Ying, Simulation optimization with PSO and OCBA for semiconductor back-end assembly, Journal of Industrial and Production Engineering, vol. 30, pp. 452–460, 2013 [17] Lin, James T., Chen, Chien-Ming, Simulation optimization approach for hybrid flow shop scheduling problem in semiconductor back-end manufacturing, Simulation Modelling Practice and Theory, vol. 55, pp. 100-114, 2015 [18] Lin, James T., Huang, Chao-Jung, A simulation-based optimization approach for a semiconductor photobay with automated material handling system, Simulation Modelling Practice and Theory, vol. 46, pp. 76-100, 2014 [19] Liu, C.Y., Chang, S.C., Scheduling flexible flow shops with sequence-dependent setup effects, IEEE Trans Robotics Automation, vol.16, 2000 [20] Mortezaei, Navid and Zulkifli, Norzima, Integration of Lot Sizing and Flow Shop Scheduling with Lot Streaming, Journal of Applied Mathematics ,vol.2013, 2013 [21] Pan, Quan-Ke, Tasgetiren, M. Fatih, Suganthan, P.N. and Chua, T.J., A discrete artificial bee colony algorithm for the lot-streaming flow shop scheduling problem, Information Sciences , vol.181, pp. 2455–2468, 2011 [22] Ribas, I, Leisten, R. and Framin ̃an, JM., Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective, Computers & Operations Research, vol.37, pp. 1439–1454, 2010 [23] Ruiz, Rubén and Vázquez-Rodríguez, José Antonio, The hybrid flow shop scheduling problem, European Journal of Operational Research, vol.205, pp. 1–18, 2010 [24] Santos, DL, Hunsucker, JL. and Deal, DE., Global lower bounds for flow shops with multiple processors, European Journal of Operational Research, Vol 80, pp.112–120, 1995 [25] Sarper, H. and Henry, MC., Combinatorial Dispatching Rules in A Two-machine Flow Evaluation of Six Dynamic Shop, Omega, Vol. 24, No. 1, pp. 73-81, 1996 [26] Uetake, T.H., Tsubone H. and Ohba M., A production scheduling system in a hybrid flow shop, International Journal of Production Economics, vol.41, pp. 395-398, 1995 [27] Vallada, Eva and Ruiz, Ruben, A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times. European Journal of Operational Research ,vol.211, pp. 612–622, 2011 [28] Wang, I-Lin, Yang, Taho and Chang, Yu-Bang, Scheduling two-stage hybrid flow shops with parallel batch, release time, and machine eligibility constraints, Journal of Intelligent Manufacturing, vol.23, pp. 2271–2280, 2012 [29] Yang, Taho, Kuo, Yiyo and Cho, Chiwoon, A genetic algorithms simulation approach for the multi-attribute combinatorial dispatching decision problem, European Journal of Operational Research , vol.176, pp. 1859–1873, 2007 [30] Zhang, Si, Chen, Pan, Lee, Loo Hay, Peng, Chew Ek and Chen, Chun-Hung, Simulation Optimization Using the Particle Swarm Optimization with Optimal Computing Budget Allocation. Proceedings of the Winter Simulation Conference, 2011. [31] Zhang, Wei, Yin, Changyu, Liu, Jiyin and Linn, Richard J., Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops, International Journal of Production Economics, vol.96, pp. 189–200, 2005
|