|
Bozejko, W., Pempera, J., and Smutnicki, C. (2013). Parallel tabu search algorithm for the hybrid flow shop problem. Computers and Industrial Engineering, 65(3), 466-474.
Chan, T. S., Prakash, A., Ma, H. L., and Wong, C. S. (2013). A hybrid tabu sample-sort simulated annealing approach for solving distributed scheduling problem. International Journal of Production Research, 51(9), 2602-2619.
Chen, J. C., Chao, G. C., Sun, C. J., Chao, K. J., Chien, J. W., Chen, C. C., Mo, C. N., Peng, T. W., Wei, Y. Y., Feng, C. H., Liu, Y. C., and Chiang, M. T. (2009). Effective order assignment for color filter fabs. SID Symposium Digest of Technical Papers, 40(1), 1309-1312.
Chen, J. C., Hu, S. J., Huang, P. T. B., Lin, C. J., Chao, K. J., and Chen, C. C. (2010). Finite capacity planning for multiple TFT-LCD color filter fabs. Key Engineering Materials, 419-420, 637-640.
Chen, W. L., Huang, C. Y., and Lai, Y. C. (2009). Multi-tier and multi-site collaborative production: Illustrated by a case example of TFT-LCD manufacturing. Computers and Industrial Engineering, 57(1), 61-72.
Chen, J. C., Huang, P. T. B., Wu, J. G., Lai, K. Y., Chen, C. C., and Peng, T. W. (2013). Advanced planning and scheduling for TFT-LCD color filter fab with multiple lines. The International Journal of Advanced Manufacturing Technology, 67(1-4), 101-110.
Chen, J. C., Su, L. H., Chen, C. C., Peng, T. W., and Chao, G. C. (2011). Release planning for color filter fabs based on iterative simulation. Journal of the Society for Information Display, 19, 480-487.
Choi, B. K., and Seo, J. C. (2009). Capacity-filtering algorithms for finite-capacity planning of a flexible flow line. International Journal of Production Research, 47(12), 3363-3386.
Chung, S. H., Tai, Y. T., and Pearn, W. L. (2009). Minimising makespan on parallel batch processing machines with non-identical ready time and arbitrary job sizes. International Journal of Production Research, 47(18), 5109-5128.
Condotta, A., Knust, S., Meier, D., and Shakhlevich, N. V. (2013). Tabu search and lower bounds for a combined production–transportation problem. Computers and Operations Research, 40(3), 886-900. Hasani, K., Kravchenko, S. A., and Werner, F. (2014). Simulated annealing and genetic algorithms for the two-machine scheduling problem with a single server. International Journal of Production Research, 52(13), 3778-3792.
Lamghari, A., and Dimitrakopoulos, R. (2012). A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty. European Journal of Operational Research, 222(3), 642-652.
Li, X. Y., Baki, F., Tian, P., and Chaouch, B. A. (2014). A robust block-chain based tabu search algorithm for the dynamic lot sizing problem with product returns and remanufacturing. Omega, 42(1), 75-87.
Lin, J. T., Chen, T. L., and Chu, H. C. (2014). A stochastic dynamic programming approach for multi-site capacity planning in TFT-LCD manufacturing under demand uncertainty. International Journal of Production Economics, 148, 21-36.
Lin, J. T., Chen, T. L., and Lin, Y. T. (2009). Critical material planning for TFT-LCD production industry. International Journal of Production Economics, 122(2), 639-655.
Li, J. Q., Pan, Q. K., and Liang, Y. C. (2010). An effective hybrid tabu search algorithm for multi-objective flexible job-shop scheduling problems. Computers and Industrial Engineering, 59(4), 647-662.
Lin, J. T., Wang, F. K., and Peng, C. C. (2008). Lot release times and dispatching rule for a TFT-LCD cell process. Robotics and Computer-integrated Manufacturing, 24(2), 228-238.
Lin, Y. K., Yeh, C. T., and Huang, P. S. (2013). A hybrid ant-tabu algorithm for solving a multistate flow network reliability maximization problem. Applied Soft Computing, 13(8), 3529-3543.
Ou-Yang, C., and Hon, S. J. (2006). Developing an agent-based APS and ERP collaboration framework. The International Journal of Advanced Manufacturing Technology, 35(9-10), 943-967.
Pa, P. S. (2013). High-performance micro-electrochemical machining via an optoelectronic irradiation and a graded modular tool. International Journal of Advanced Manufacturing Technology, 64(1-4), 179-186.
Paquette, J., Cordeau, J. F., Laporte, G., and Pascoal, M. B. (2013). Combining multicriteria analysis and tabu search for dial-a-ride problems. Transportation Research Part B, 52, 1-16.
Pitts, R. A., and Ventura, J. A. (2009). Scheduling flexible manufacturing cells using tabu search. International Journal of Production Research, 47(24), 6907-6928.
Ponsich, A., and Coello, C. A. (2013). A hybrid differential evolution—tabu search algorithm for the solution of job-shop scheduling problems. Applied Soft Computing, 13(1), 462-474.
Safaei, N., Banjevic, D., and Jardine, K. S. (2012). Multi-threaded simulated annealing for a bi-objective maintenance scheduling problem. International Journal of Production Research, 50(1), 63-80.
Shin, H. J., and Kang, Y. H. (2010). A rework-based dispatching algorithm for module process in TFT-LCD manufacture. International Journal of Production Research, 48(3), 915-931.
Solimanpur, M., and Elmi, A. (2011). A tabu search approach for group scheduling in buffer-constrained flow shop cells. International Journal of Computer Integrated Manufacturing, 24(3), 257-268.
Sterzik, S., and Kopfer, H. (2013). A tabu search heuristic for the inland container transportation problem. Computers and Operations Research, 40(4), 953-962.
Sureshkumar, M. R., and Madhusudanan, P. V. (2013). An efficient method to reduce relative capacity shortage using annualised hours planning. International Journal of Advanced Manufacturing Technology, 65(1-4), 571-580.
Tai, Y. T., and Lai, C. M. (2011). The liquid crystal injection scheduling problem (LCISP). International Journal of Production Research, 49(2), 467-484.
Tsai, K. M., and Wang, S. C. (2009). Multi-site available-to-promise modeling for assemble-to-order manufacturing: An illustration on TFT-LCD manufacturing. International Journal of Production Economics, 117(1), 174-184.
Wang, S., and Liu, M. (2014). Two-stage hybrid flow shop scheduling with preventive maintenance using multi-objective tabu search method. International Journal of Production Research, 52(5), 1495-1508.
Wu, H. H., Chen, C. P., Tsai, C. H., and Yang, C. J. (2010). Simulation and scheduling implementation study of TFT-LCD Cell plants using Drum–Buffer–Rope system. Expert Systems with Applications, 37(12), 8127-8133.
Wu, C. H., Lin, J. T., and Wu, H. H. (2010). Robust production and transportation planning in thin film transistor-liquid crystal display (TFT-LCD) industry under demand and price uncertainties. International Journal of Production Research, 48(20), 6037-6060.
Wu, W. H., Xu, J. Y., Wu, W. H., Yin, Y. Q., Cheng, I. F., and Wu, C. C. (2013). A tabu method for a two-agent single-machine scheduling with deterioration jobs. Computers and Operations Research, 40(8), 2116-2127.
Yang, T., and Lu, J. C. (2010). A hybrid dynamic pre-emptive and competitive neural-network approach in solving the multi-objective dispatching problem for TFT-LCD manufacturing. International Journal of Production Research, 48(16), 4807-4828.
王立志,2003,供應鏈實戰手冊:應用APS跨越MRP鴻溝,鼎誠資訊
|