|
[1]Barton, R.R., J.S. Ivey. 1996. “Nelder-Mead simplex modifications for simulation optimization”, Management Science, 42(7), pp.954-973. [2]Barton, R.R., M. Meckesheimer. 2006. “Metamodel-based simulation optimization”, Operations Research and Management Science, 13, pp.535-574, Elsevier, Amsterdam. [3]Chang, K.H., L.J. Hong, and H. Wan. 2013. “Stochastic trust-region response surface method (STRONG)-a new response surface framework for simulation optimization”, INFORMS Journal on Computing, 25(2), pp.230-243. [4]Chen, T., Y.C. Lin. 2009. “A fuzzy back propagation network ensemble with example classification for lot output time prediction in a wafer fab”, Applied Soft Computing, 9(2), pp.658-666. [5]Chien, C.F., C. Chen. 2007. “Using ga and ctpn for modeling the optimization-based schedule generator of a generic production scheduling system”, International Journal of Production Research, 45(8), pp.1763-1789. [6]Conn, A.R., N.L.M. Gould, P.L. Toint. 2000. “Trust-region methods”. [7]Chung, S.H., H.W. Huang. 2002. “Cycle time estimation for wafer fab with engineering lots”, IIE Transactions, 34(2), pp.105-118. [8]Ehteshami, B., R.G. Petrakian, P.M. Shabe. 1992. “Trade-offs in cycle time management: hot lots”, IEEE Transactions on Semiconductor Manufacturing, 5(2), pp.101-106. [9]Fu, M.C. 2002. “Optimization for simulation: Theory vs. practice”, INFORMS Journal on Computing, 14(3), pp.192-215. [10]Gallant, A. R. 1987. “Nonlinear statistical models”, John Wiley, New York. [11]Goldberg, D.E. 1989. “Genetic algorithms in search, optimization, and machine learning”, 412, Reading Menlo Park: Addison-wesley. [12]Hsieh L.Y., K.H. Chang, and C.F. Chien. 2013. “Efficient development of cycle time response surfaces using progressive simulation metamodeling”, International Journal of Production Research, 52(10), pp.3097-3109. [13]Kirkpatrick, S., and M.P. Vecchi. 1983. “Optimization by simulated annealing”, Science, 220(4598), pp.671-680. [14]Law, A.M. 2007. “Simulation modeling and analysis”, 4th ed, McGraw-Hill, Boston. [15]Myers, R.H., and C.M. Anderson-Cook. 2009. “Response surface methodology: process and product optimization using designed experiments”, 705, John Wiley & Sons. [16]Nadarajah, S., S. Kots. 2008. “The cycle time distribution”, International Journal of Production Research, 46(11), pp.3133-3141. [17]Neddermeijer, H.G., G.J.V. Oortmarssen, N. Piersma, R. Dekker. 2000. “A framework for response surface methodology for simulation optimization”, J.A. Joines, R.R. Barton, K. Kang, P.A. [18]SchÄomig, A., J. W. Fowler. 2000. “Modelling semiconductor manufacturing operations”, Proceedings of the 9th ASIM Simulation in Production and Logistics Conference, 55(64), Berlin, Germany. [19]Shanthikumar, J.G., S. Ding, M.T. Zhang. 2007. “Queueing theory for semiconductor manufacturing systems: A survey and open problems”, IEEE Transactions on Automation Science and Engineering, 4(4), pp.513-522. [20]Sivakumar, A.I., C.S. Chong. 2001. “A simulation based analysis of cycle time distribution, and throughput in semiconductor backend manufacturing”, Computers in Industry, 45(1), pp.59-78. [21]Spall, J.C. 2005. “Introduction to Stochastic Search and Optimization: Estimation, Simulation, and Control”, John Wiley and Sons., New York. [22]Wein, L.M. 1988. “Scheduling semiconductor wafer fabrication”, IEEE Transactions on Semiconductor Manufacturing, 1(3), pp.115-130. [23]Yang, F., B.E. Ankenman, B.L. Nelson. 2007. “Efficient generation of cycle time-throughput curves through simulation and metamodeling”, Naval Research Logistics, 54(1), pp.78-93. [24]Yang, F., B.E. Ankenman, B.L. Nelson. 2008. “Cycle time percentile curves for manufacturing systems”, INFORMS Journal on Computing, 20(4), pp.628-643. [25]林則孟,2001,「系統模擬理論與應用」,初版,滄海書局。 [26]黎正中,2010,「實驗設計與分析」,第七版,高立圖書有限公司。 [27]姜林杰祐,張逸輝,陳家明,黃家祚,2001,「系統模擬eM-Plant_(SIMPLE++)操作與實務」,初版,華泰文化事業股份有限公司。
|