|
參考文獻 1. Belokar, R.M., Kumar, V., Kharb, S.S., (2012), An Application of Value Stream Mapping In Automotive Industry: A Case Study, International Journal of Innovative Technology and Exploring Engineering, Vol. 1 No. 2, pp. 152-157. 2. Browning, T.R., Heath, R.D. (2009), Reconceptualizing the effects of lean on production costs with evidence from the F-22 program, Journal of Operations Management, Vol. 27 No. 1, pp. 23-44. 3. Chang, T.S., Wan, Y.W., Ooi, W.T. (2009), A stochastic dynamic traveling salesman problem with hard time windows, European Journal of Operational Research, Vol. 198, pp. 748–759. 4. Corakci, M.A. (2008), An evaluation of kitting systems in lean production, University College of Boras School of Engineering, Sweden. 5. Demeter, K., Matyusz, Z. (2011), The impact of lean practices on inventory turnover, International Journal of Production Economics, Vol. 133, pp. 154-163. 6. Fawaz, A.A., Jayant, R. (2007), Analyzing the benefits of lean manufacturing and value stream mapping via simulation-A process sector case study, International Journal of Production Economics, Vol. 107, pp. 223-236. 7. Holweg, M. (2007), The genealogy of lean production, Journal of Operations Management, Vol. 25, pp. 420–437. 8. Johansson, J., Abrahamsson, L. (2009), The good work - A Swedish trade union vision in the shadow of lean production, Applied Ergonomics, Vol. 40 No. 4, pp. 775-780. 9. Lander, E., Liker, J.K. (2007), The Toyota production system and art: making highly customized and creative products the Toyota way, International Journal of Production Research, Vol. 45 No. 16, pp. 3681-3698. 10. New, S.J. (2007), Celebrating the enigma: the continuing puzzle of the Toyota Production System, International Journal of Production Research, Vol. 45 No. 16, pp. 3545-3554. 11. Nordin, N., Deros, B.M., Wahab D.A. (2010), A survey on lean manufacturing implementation in Malaysian automotive industry, International Journal of Innovation, Management and Technology, Vol. 1 No. 4, pp. 374-379. 12. Patrick, W. (2005), Lean at NUMMI, Manufacturing Engineering, Vol. 135 No. 3, pp. 73-84. 13. Paul, P., Koshy, J., Abraham B.C. (2013), Conversion of Regular Assembly Line into Cellular Manufacturing Layout, International Journal of Engineering and Innovative Technology, Vol. 2 No. 7, pp. 250-255. 14. Rubio, S., Albert, C. (2008), Optimal manufacturing–remanufacturing policies in a lean production environment, Computers & Industrial Engineering, Vol. 55, pp. 234-242. 15. Salaheldin, S.I. (2005), JIT implementation in Egyptian manufacturing firms: some empirical evidence, International Journal of Operations & Production Management, Vol. 25, No. 4, pp. 354-370. 16. Salimi, M., Hadjali, H.M., Sorooshian, S. (2012), A Lean Production Framework for Malaysian Automotive and Heavy Machinery Industry, Journal of Applied Sciences, Vol. 13 No. 11, pp. 1544-1550. 17. Vujosevic, R. (2003), Lean Kitting: A Case Study, The University of Texas, American. 18. 大野耐一,(1987)。豐田生產方式與現場管理(林耀川、成玉山譯),台北市:中華企業管理發展中心。 19. 大野耐一,(2001)。豐田生產方式(國瑞協力會TPS自主研究會編譯),台北市:財團法人中衛發展中心。 20. 土屋哲,(2001)。變種變量生產時代的IE(謝啟裕、陳青、趙有為譯),台北市:財團法人中衛發展中心。 21. 下川浩一、藤本隆宏,(2005)。豐田系統的原點,台北市:財團法人中衛發展中心。 22. 原田武彥,(2008)。CISP電子報TPS全方位視野,http://www. cisp.com.tw/images/files/epaper/news_letter_jan_08.htm,搜尋日期:2013年1月5日。 23. 經濟部工業局,(2000)。專案計劃執行成果報告之產業自動化成果案例推薦與教材撰寫(電子業)[3],台北市:經濟部。 |