|
參考文獻 [1] 王治平,“實際零工式生產排程問題的派工法則”,政治大學資訊管理研究所碩士論文,2003。 [2] 吳盈志,“雙演化演算法之研究”,中原大學資訊管理研究所碩士論文,2009。 [3] 詹詩敏,“半導體封裝廠之機台配置問題”,清華大學工業工程與工程管理所碩士論文,2010。 [4] 田孝珍,“雙目標模擬最佳化在自動化物料搬運系統之應用”,清華大學工業工程與工程管理所碩士論文,2011。 [5] Abdelmaguid, T. F.,Nasef, A. O., Kamal, B. A. and Hassan, M. F., “A hybrid GA/Heuristic approach to the simultaneous scheduling of machines and automated guided vehicles”, International Journal of Production Research, Vol.42, No.2, 2004, pp267-281. [6] Anwar, M. F. and Nagi, R., “Intergrated scheduling of material handling and manufacturing activities for JIT production of complex assemblies”, International Journal of Production Research, Vol.36, No.3, 1993, pp653-681. [7] Babu, A. G., Jerald, J., Haq, A. N., Luxmi, V. M., Vigneswaralu, T. P., “Scheduling of machines and automated guided vehicles in FMS using differential evolution”, International Journal of Production Research, 48, 2010, pp4683-4699. [8] Bagchi, T. P., “Multiobjective Scheduling by Genetic Algorithms”, Kluwer Academic Publishers: Boston, 1996. [9] Bilge, U. and Ulusoy, G., “A time windows approach to simultaneous scheduling of machines and material handling system in an FMS”, Journal of Operations Research, Vol.43, No.6, 1995, pp1058-1070. [10] Chen, C. H., Lee, L. H., “Stochastic Simulation Optimization an Optimal Computing Budget Allocation”, System Engineering and Operations Research, Vol.1, 2010. [11] Conway, R. W., Maxwell, W. L., and Miller, L. W., Theory of Scheduling, Addison Wesley, Reading Massachusetts., USA, 1967 [12] Deb, K., Agrawal, S., Pratap, A., Meyarivan, T., “A fast elitist non-dominated sorting genetic algorithm for multi-objective optimization: NSGA-II”, IEEE Trans Evol Comput, 6(2), 2002, pp182-197. [13] Fanti, M. P., “Event-based controller to avoid deadlock and collisions in zone-control AGVs”, International Journal of Production Research, Vol.40, No.6, 2002, pp1453-1478. [14] Fernández, J., Besuievsky, G., “Inverse lighting design for interior buildings integrating natural and artificial sources”, Computers & Graphics, Vol 36, No.8, 2012, pp1096-1108. [15] Groover, M. P., Automation, Production Systems, and Computer Integrated Manufacturing, Printed-Hall of India, New Delhi, 1996. [16] Hakimi-Asiabar, M., Ghodsypour, S. H., Kerachian, R., “Multi-objective genetic local search algorithm using Kohonen’s neural map”, Computers & Industrial Engineering, 56, 2009, pp1566-1576. [17] Han, H. M., McGinnis, L. F., “Control of material handling transporter in automated manufacturing”, IIE Transactions, 21(2), 1989, pp184-190. [18] Hansen, P., & Mladenivic, N., “Variable neighborhood search: Principles and application”, European Journal of Operation Research, 130, 2001, pp449-467. [19] Harmonosky, C. M., “Simulation-based real-time scheduling:review of recent developments”, Procedings of the 1995 Winter Simulation Conference, 1995, pp220-224. [20] Hart, W. E., “Adaptive Global Optimization with Local Search”, PhD Thesis, University of California, San Diego, 1994. [21] Ilkyeong, M., Lee, J., “Genetic Algorithm Application to the Job Shop Scheduling Problem with Alternative Routing”,BK21 Logistics Team, Industrial Engineering, Pusan National University, 2000, pp1-99. [22] Jerald, J., Asokan, P., Saravanan, P., Rani, D. C., “Simultaneous scheduling of parts and automated guided vehicles in an FMS environment using adaptive genetic algorithm”, International Journal Advanced Manufacturing Technology, 29, 2006, pp584-589. [23] Karabuk, S., and SabunChoglu, I., “A beam search based algorithm for scheduling machines and AGVs in an FMS”, Proc. Second Industrial Engg. Res. Conf, 1993, pp308-312. [24] Kim, K. W., Lee, D., Jeong, I.J., “Multi-objective Genetic Algorithm for Multistage-based Job Processing Schedules in FMS Environment”, IEEE International Conference on Control and Automation, 2007, pp.1705-1709. [25] Kumar, M. V. S., Janardhana, R., Rao, CSP., “Simultaneous scheduling of machines and vehicles in an FMS environment with alternative routing”, International Journal Advanced Manufacturing Technology, 53, 2011, pp339-351. [26] Lacomme, P., Moukrim, A., Tchernev, N., “Simultaneous job input sequencing and vehicle dispatching in a single-vehicle automated guide vehicle system:a heuristic branch-and-bound approach coupled with a discrete events simulation model”, International Journal of Production Research, Vol.43, No.9, pp1911-1942. [27] Nasr, N. and Elsayed, E. A., “Job Shop with Alternative Machines”, International Journal of Production Research, Vol.28, No.9, 1990, pp1595-1609. [28] Ombuki, B. M. and Ventresca, M., “Local Search genetic algorithms for the job shop scheduling problem”, Appl. Intell., Vol.21, No.1, 2004, pp99-109. [29] Ono, I., Yamamura, M. and Kobayashi, S., “A genetic algorithm for job-shop scheduling problems using job-based order crossover”, in:Proceedings of ICEC’96, 1996, pp547-552. [30] Parthasarthy, S., Rajendran, C., “A simulated annealing heuristic for scheduling to minimize weighted tardiness in a flowshop with sequence dependent setup times of jobs-a case study”, Prodouction Planning & Control, 8:5, 1997, pp475-485. [31] Pasupathy, T., Rajendran, C., Suresh, R. K., “A multiobjective genetic algorthim for scheduling in flow shops to minimize the makespan and total flow time of jobs”, Internet. J. Adv. Manufacturing Tech, 27, 2006, pp804-815. [32] Raman, N., Talbot, F. B., Rachamadugu, R. V., “Simultaneous scheduling machines and material handling devices in automated manufacturing”, Proceedings of second ORSA/TIMS Conference on Flexible Manufacturing System,1986, pp455-466. [33] Reddy, B. S. P. and Rao, C. S. P., “A hybrid multi-objective GA for simultaneous scheduling of machines and AGVs in FMS”, International Journal of Advanced Manufacturing Technology, 31, 2006, pp602-613. [34] Satishkumar, M. V., “Simultaneous scheduling of machines and Agvs using evolutionary optimization algorithms”, PhD Thesis, Jawaharlal Nehru Technological University, 2011. [35] Srinivas, N. and Deb, K., “Multiobjective Optimization Using Nondominated Sorting in Genetic Algorithms”, Evolutionary Computation, Vol.2, 221-248, 1994. [36] Stecke, K. E., “Design, planning, scheduling, and control problems of flexible manufacturing systems”, Annals of Operations Research, 3, 1985, pp.1-13. [37] Subbaiah, K. V., Rao, M. N. and Rao, K.N., “Scheduling of AGVs and machines in FMS with makespan criteria using sheep flock heredity algorithm”, International journal of Physical Sciences, 4, 2009, pp139-148. [38] Ulusoy, G., and Bilge, U., “Simultaneous Scheduling of machines and automated guided vehicles”, International Journal of Production Research, Vol.31, No.12, 1993, pp2857-2873. [39] Ulusoy, G., Srvnkaya, F. – Serifogulg, Umit, Bilge, “A Genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles”, Computers & Operations Research, Vol.24, No.4, 1997, pp335-351. [40] Vis, I., “Survey of Research in the Design and Control of Automated Guided Vehicle Systems”, European J. of Operational Res., 170, 2006, pp677-709. [41] Wang, F. K. and Lin, J. T., “Performance evalution of an automated material handling system for a wafer fab”, Robotics and Computer-Integrated Manufacturing, vol. 20, 2004, pp91-100. [42] Wilhelm, W. and Shin, H. “Effectiveness of alternative operations in a flexible manufacturing system”, International Journal of Production Research, 23, 1985, pp65-79. [43] Yeh, M.S., Yeh, W.C., “Deadlock prediction and avoidance for zone-control AGVs”, International Journal of Production Research, 36(10), 1998, pp2879-2889.
|