|
英文文獻 1.James P Womack, Daniel T Jones and Daniel Roos. (2007). The Machine That Changed the World. ISBN:0743299795. 2.George Liberopoulos. (2013). Production Release Control: Paced, WIP-Based or Demand-Driven? Revisiting the Push/Pull and Make-to-Order/Make-to-Stock Distinctions. Handbook of Stochastic Models and Analysis of Manufacturing System Operations, pp. 211–247. 3.Wu Zheng, Yanhua Ma, Yubin Zheng, Xiaohui Shi, Bing Li and Ying Jiang. (2010). The Research of Pull Production Strategy and Method. 2010 International Conference on Management and Service Science, pp. 1-4. 4.Darwin S. Aldás, John P. Reyes, Luis A. Morales, Kevin M. Álvarez, Narcisa de J. Portalanza and Ricardo J. Amán. (2018). Manufacturing Strategies for an Optimal Pull-Type Production Control System. Case Study in a Textile Industry. 2018 Congreso Internacional de Innovación y Tendencias en Ingeniería (CONIITI), pp. 1-6. 5.Huimin Xiao and Guozheng Zhang. (2010). The queuing theory application in bank service optimization. 2010 International Conference on Logistics Systems and Intelligent Management (ICLSIM), pp. 1097-1100. 6.Feng Xing. (2011). Research on reasonable arrangement of ophthalmology sickbeds in hospital based on queuing theory. 2011 International Conference on Mechatronic Science, Electric Engineering and Computer (MEC), pp. 2186-2190. 7.John F. Shortle, James M. Thompson and Donald Gross. (2018). Fundamentals of Queueing Theory, 5th Edition. ISBN:978-1-118-94352-6. 8.Averill Law. (2014). Simulation Modeling and Analysis, 5th Edition. ISBN:9780073401324. 9.Peters Brett and Yang Taho. (1997). Integrated Facility Layout and Material Handling System Design in Semiconductor Fabrication Facilities. IEEE Transactions on Semiconductor Manufacturing, Vol.10, No.3, pp.360-369. 10.Chen Mark, Mcginnis L and Zhou C. (1999). Design and Operation of Single-Loop Dual-Rail Inter-Bay Material Handling System. International Journal of Production Research, Vol.37, No.10, pp.2217-2237. 11.Gaxiola Gabriel and Hennessy Larry. (2001). Evaluation of advantages of integrating 300mm AMHS fab layouts in the photo area. IEEE International Symposium on Semiconductor Manufacturing Conference, Proceedings, pp.373-376. 12Egbelu P. J and Wu C.T. (1993). A comparison of dwell point rules in an automated storage/retrieval system. International Journal of Production Research, Vol.31, No.11, pp.2515-2530. 中文文獻 1.陳逸梵(2016),應用等候理論分析高雄港貨櫃車輛作業績效,國立高雄海洋科技大學航運管理研究所碩士論文,高雄市。 2.蔣宜芳(2022),使用排隊理論分析室外空氣品質與人口流動對於COVID-19 的爆發風險,國立臺灣師範大學資訊工程學系碩士論文,台北市。 3.林則孟 (2001),系統模擬理論與應用,滄海書局。 4.陳紹偉(1999),12吋IC代工廠自動搬運系統之系統模擬與派工法則的研究,國立臺灣大學機械工程學研究所碩士論文,台北市。 5.顏柄榮(2000),半導體晶圓廠自動化物料搬運系統之模擬研究,國立清華大學工業工程與工程管理學系碩士論文,新竹市。 6.江貞誼(2004),探討於晶圓廠自動化物料搬運系統中加裝捷徑裝置之效益研究,國立臺灣大學機械工程學研究所碩士論文,台北市。 7.陳育民(2012),探討晶圓緩衝區傳送效率於半導體廠自動化物料搬運系統,國立成功大學工學院工程管理碩士在職專班碩士論文,台南市。 8.吳銘山(2017),12吋晶圓廠自動化搬運系統生產績效研究及成本分析-以機台晶圓暫存器(Near Tool Material Buffer)為例,國立成功大學經營管理碩士學位學程(AMBA)碩士論文,台南市。 9.李宜達(2011),控制系統設計與模擬:使用MATLAB/SIMULINK,全華圖書。 10.楊國隆、熊高生(2009),作業研究入門導引:使用LINGO,文魁資訊。 網路資源 1.SEMI網頁,(https://www.semi.org/en/news-media-press-releases/semi-press-releases/global-fab-equipment-spending-forecast-to-reach-all-time-high-of-nearly-%24100-billion-in-2022-semi-reports) 2.數位時代網頁,(https://www.bnext.com.tw/article/71953/foundry-cost) 3.Muratec公司網頁,(https://www.muratec.net/cfa/products/stocker.html、https://www.muratec.net/cfa/products/toolstation.html) 4.LINDO公司網頁,(https://www.lindo.com/) 5.鋐京公司網頁,( http://hongkingltd.com/product/product-demo/) 6.The MathWorks公司介紹網頁,( https://ww2.mathworks.cn/products/simulink.html)
|