|
1. Ali, A., Birkett, M., Hackney, P., & Bell, D. (2016, September). Efficient nondominated sorting with genetic algorithm for solving multi-objective job shop scheduling problems. Multidisciplinary Engineering Design Optimization (MEDO) International Conference, (pp. 1-6). 2. Bang, J.-Y., & Kim, Y.-D. (2011, March). "Scheduling algorithms for a semiconductor probing facility". Computers & Operations Research, Vol. 38, No. 3, pp. 666-673. 3. Blackstone, J. H., Phillips, D. T., & Hogg, G. L. (1982). A state-of-the-art survey of dispatching rules for manufacturing job shop operations. International Journal of Production Research, pp. 27-45. 4. Chaudhry, I. A., & Khan, A. A. (2016, May). A research survey: review of flexible job shop scheduling techniques. International Transactions in Operational Research, Vol. 23, No. 3, pp. 551-591. 5. Chen, J. C., & Chen, C.-W. (2009, May). Capacity planning of serial and batch machines with capability constraints for wafer fabrication plants. International Journal of Production Research, Vol. 48, No. 11, pp. 3207-3223. 6. Chen, J. C., Chen, C.-W., Lin, C. J., & Rau, H. (2005, June). Capacity planning with capability for multiple semiconductor manufacturing fabs. Computers & Industrial Engineering, Vol. 48, No. 4, pp. 709-732. 7. Chen, J. C., Chen, T.-L., Ou, T.-C., & Lee, Y.-H. (2019, December). Adaptive genetic algorithm for parcel hub scheduling problem with shortcuts in closed-loop sortation system. Computers & Industrial Engineering, Vol. 138, pp. 106-114. 8. Chen, J. C., Chen, Y.-Y., Chen, T.-L., & Kuo, Y.-H. (2019, July). Applying two-phase adaptive genetic algorithm to solve multi-model assembly line balancing problems in TFT–LCD module process. Journal of Manufacturing Systems, Vol. 52, Part A, pp. 86-99. 9. Chen, J. C., Fan, Y.-C., & Chen, C.-W. (2009, June). Capacity requirements planning for twin Fabs of wafer fabrication. International Journal of Production Research, Vol. 47, pp. 4473-4496. 10. Chen, J. C., Huang, P. B., Wu, J.-G., Lai, K. Y., Chen, C.-C., & Peng, T.-W. (2013, July). Advanced planning and scheduling for TFT-LCD color filter fab with multiple lines. The International Journal of Advanced Manufacturing Technology, Vol. 67, pp. 101–110. 11. Chen, J. C., Su, L.-H., Sun, C.-J., & Hsu, M.-F. (2010). Infinite capacity planning for IC packaging plants. International Journal of Production Research, Vol. 48, pp. 5729-5748. 12. Chen, J. C., Sun, C.-J., & Chen, T.-L. (2015). Capacity planning for integrated circuit final test plants. International Journal of Computer Integrated Manufacturing, Vol. 28, No. 12, pp. 1262-1274. 13. Chen, J. C., Wu, C.-C., Chen, C.-W., & Chen, K.-H. (2012, September). Flexible job shop scheduling with parallel machines using genetic algorithm and grouping genetic algorithm. Expert Systems with Applications, Vol. 39, No. 11, pp. 10016-10021. 14. Gen, M., Tsujimura, Y., & Kubota, E. (1994). Solving job-shop scheduling problems by genetic algorithm. Proceedings of IEEE International Conference on Systems, Man and Cybernetics, Vol. 2, pp. 1577-1582. 15. Heizer, J. (2006). "生產與作業管理". 偉碩出版社. 16. Holland, J. H. (1992, July). Genetic Algorithms. Scientific American, Vol. 267, No. 1, pp. 66-73. 17. Huang, S., Tian, N., Wang, Y., & Ji, Z. (2016, August). Multi-objective flexible job-shop scheduling problem using modified discrete particle swarm optimization. SpringerPlus, Vol. 5. 18. Jain, A., & Meeran, S. (1999, March). Deterministic job-shop scheduling: Past, present and future. European Journal of Operational Research, Vol. 113, No. 2, pp. 390-434. 19. Kuo, R. J., & Han, Y. S. (2011, August). A hybrid of genetic algorithm and particle swarm optimization for solving bi-level linear programming problem – A case study on supply chain model. Applied Mathematical Modelling, Vol. 35, No. 8, pp. 3905-3917. 20. Salza, P., & Ferrucci, F. (2019, March). Speed up genetic algorithms in the cloud using software containers. Future Generation Computer Systems, Vol. 92, pp. 276-289. 21. Shen, X.-N., & Yao, X. (2015, March). Mathematical modeling and multi-objective evolutionary algorithms applied to dynamic flexible job shop scheduling problems. Information Sciences, Vol. 298, pp. 198-224. 22. Stadtler, H. (2005, June). "Supply chain management and advanced planning – basics, overview and challenges". European Journal of Operational Research, Vol. 163, No. 3, pp. 575-588. 23. Stevenson, W. J. (2011). "Operations Management". McGraw-Hill. 24. Yan, J., & Wu, X. (2015, August). A Genetic Based Hyper-Heuristic Algorithm for the Job Shop Scheduling Problem. Intelligent Human-Machine Systems and Cybernetics (IHMSC) 2015 7th International Conference, Vol. 1, (pp. 161-164). 25. 王立志. (2006). "系統化運籌與供應鏈管理:企業營運新典範". 滄海圖書. 26. 林則孟. (2006). 生產計畫與管理. 華泰書局. 27. 陳建良. (1995). 排程概述. 機械工業雜誌, pp. 122-137. 28. 鄭榮郎. (2018). 生產計畫與管理. 全華圖書. 29. 林子獻. (2014). 比較模擬退火演算法與禁忌搜尋演算法於TFT-LCD彩色濾光片廠先進規劃排程系統.國立清華大學工業工程與工程管理學系碩士論文. 新竹市. 30. 莊美琪. (2014). 應用啟發式演算法求解等效率平行機台排程問題. 國立清華大學工業工程與工程管理學系博士論文. 新竹市. 31. 林佩儀. (2016). 以基因演算法求解彈性製造工廠之製程規劃與排程問題. 國立交通大學工業工程與管理系所碩士論文. 新竹市. 32. 王治平. (2003). 實際零工式生產排程問題的派工法則. 國立政治大學資訊管理研究所碩士論文. 台北市. 33. 田國興. (2000). 有設置時間之流程型工廠多階段平行機台總排程時間最小化問題. 中原大學工業工程學系碩士論文. 桃園縣. |