|
Arizono, I., Kanagawa, A., Ohta, H., Watakabe, K., & Tateishi, K. (1997). Variable sampling plans for normal distribution indexed by Taguchi's loss function. Naval Research Logistics (NRL), 44(6), 591-603. Arizono, I., Okada, Y., Tomohiro, R., & Takemoto, Y. (2016). Rectifying inspection for acceptable quality loss limit based on variable repetitive group sampling plan. The International Journal of Advanced Manufacturing Technology, 85(9-12), 2413-2423. Arizono, I., Okada, Y., Tomohiro, R., & Takemoto, Y. (2018). Rectifying inspection for PAOSQLL scheme based on variable repetitive group sampling plan. The International Journal of Advanced Manufacturing Technology, 94(1), 145-154. Aslam, M., Khan, N., & Khan, H. (2015). SkSP-V Acceptance sampling plan based on process capability index. Chiang Mai Journal of Science, 42(1), 258-267. Bowker, A. H., & Goode, H. P. (1952). Sampling Inspection by Variables: McGraw-Hill. Boyles, R. A. (1991). The Taguchi capability index. Journal of Quality Technology, 23(1), 17-26. Chan, L. K., Cheng, S. W., & Spiring, F. A. (1988). A new measure of process capability: . Journal of Quality Technology, 20(3), 162-175. Collins, R. D., Case, K. E., & Kemble Bennett, G. (1973). The effects of inspection error on single sampling inspection plans. International Journal of Production Research, 11(3), 289-298. Crosby, P. B. (1979). Quality is Free : The Art of Making Quality Certain.: McGraw-Hill. Deming, W. E. (1986). Out of The Crisis. Cambridge, Mass.: Massachusetts Institute of Technology, Center for Advanced Engineering Study. Dodge, H. F. (1955). Skip-lot sampling plan. Industrial Quality Control, 11(5), 3-5. Dodge, H. F. (1967). A new dual system of acceptance sampling. Technical Report No. 16. Dodge, H. F., & Romig, H. (1929). A method of sampling inspection. The Bell System Technical Journal, 8(4), 613-631. Dodge, H. F., & Romig, H. G. (1959). Sampling inspection tables. Ferrell, W. G., & Chhoker, A. (2002). Design of economically optimal acceptance sampling plans with inspection error. Computer and Operations Research (Vol. 29): Elsevier Science Ltd. Govindaraju, K., & Ganesalingam, S. (1997). Sampling inspection for resubmitted lots. Communications in Statistics - Simulation and Computation, 26, 1163-1176. Guenther, W. (1984). Determination of rectifying inspection plans for single sampling by attributes. Journal of Quality Technology, 16, 56-63. Hamaker, H. C. (1979). Acceptance sampling for percent defective by variables and by attributes. Journal of Quality Technology, 11(3), 139-148. Hsiang, T. C., Taguchi, G. (1985). A tutorial on quality control and assurance – the Taguchi methods. ASA Annual Meeting. Ishikawa, K., & Loftus, J. H. (1990). Introduction to quality control. Tokyo: 3A Corporation. Itay, N., Yisrael, P., & Edna, S. (2009). Developing a sampling plan based on . Quality Engineering, 21(3), 306-318. Juran, J. M. (1974). Quality Control Handbook (Vol. 3): McGraw-Hill. Kane, V. E. (1986). Process capability indices. Journal of Quality Technology, 18(1), 41-52. Klufa, J. (2010). Exact calculation of the Dodge-Romig LTPD single sampling plans for inspection by variables. Statistical Papers, 51, 297-305. Lin, G., & Pearn, W. (2003). Distributions of the estimated process capability index Cpk. Economic Quality Control, 18(2), 263-279. Lin, P. C., & Pearn, W. L. (2005). Testing manufacturing performance based on capability index . The International Journal of Advanced Manufacturing Technology, 27(3), 351-358. Montgomery, D. C. (2009). Introduction to Statistical Quality Control. 6th Edition: John Wiley & Sons. Montgomery, D. C. (2012). Design and Analysis of Experiments. 8th Edition: John Wiley & Sons. Morita, M., Arizono, I., & Takemoto, Y. (2008). Variable sampling inspection plans with screening for assuring average outgoing surplus quality loss limit indexed by Taguchi’s loss. The International Journal of Advanced Manufacturing Technology, 41(9-10), 908–915. Negrin, I., Parmet, Y., & Schechtman, E. (2011). Developing a sampling plan based on —unknown variance. Quality and Reliability Engineering International, 27(1), 3-14. Pearn, W., & Shu, M. H. (2003). Lower confidence bounds with sample size information for applied to production yield assurance. International Journal of Production Research, 41, 3581-3599. Pearn, W. L., & Wu, C. W. (2006). Variables sampling plans with PPM fraction of defectives and process loss consideration. Journal of the Operational Research Society, 57(4), 450-459. Pearn, W. L., & Wu, C. W. (2005). An effective decision making method for product acceptance. Omega, 35(1), 12-21. Schilling, E. G., & Neubauer, D. V. (2017). Acceptance Sampling in Quality Control: Chapman and Hall/CRC. Shapiro, S. S., & Wilk, M. B. (1965). An analysis of variance test for normality (complete samples). Biometrika, 52(3/4), 591-611. Sherman, R. E. (1965). Design and evaluation of a repetitive group sampling plan. Technometrics, 7(1), 11-21. Shewhart, W. A. (1931) Economic Control of Quality of Manufactured Product. In, (pp. 501). Bell Telephone Laboratories series: D. Van Nostrand Company, Inc., 1931. Wu, C. W., Aslam, M., & Jun, C. H. (2012). Variables sampling inspection scheme for resubmitted lots based on the process capability index . European Journal of Operational Research, 217(3), 560-566. Wu, C. W., Lee, A. H., Liu, S. W., & Shih, M. H. (2017). Capability-based quick switching sampling system for lot disposition. Applied Mathematical Modelling, 52, 131-144. Wu, Z., Xie, M., & Wang, Z. (2001). Optimum rectifying inspection plans. International Journal of Production Research, 39(8), 1575-1588. Yen, C. H., Ma, H., Yeh, C. H., & Chang, C. H. (2015). The economic design of variable acceptance sampling plan with rectifying inspection. Kybernetes, 44(3), 440-450. Zimmer, L. S., Hubele, N. F., & Zimmer, W. J. (2001). Confidence intervals and sample determination of . Quality and Reliability Engineering International, 17, 51-68.
莊雅涵 (2016)。建構以田口能力指標之快速轉換抽樣系統。國立清華大學工業工程與工程管理學系碩士論文,未出版,新竹市。 2. 胡舜珺 (2018)。建構基於製程能力指標之選別型抽樣計畫。國立清華大學工業工程與工程管理學系碩士論文,未出版,新竹市。
|