|
Fabrycky, W. J.& Blanchard, B. S. (1991). Life-Cycle Cost and Economic Analysis. NJ : Prentice Hall (International Series in Industrial and Systems: Engineering.) Hambali, A., Sapuan, S. M., Ismail, N., Nukman, Y., & Karim, M. A. (2009). The Important Role of Concurrent Engineering in Product Development process. Pertanika Journal of Sciences and Technology, 17 (1), 9. Levitt, Theodore (1960). Marketing Myopia. Harvard Business Review, (July-August), 3-13. Levitt, Theodore (1972). Production-Line Approach to Service. Harvard Business Review, (September-October), 41-52. Levitt, Theodore (1980). Marketing Success Through Differentiation-of Anything. Harvard Business Review, (January-February), 83-91. Levitt, Theodore (1983). After the Sales Is Over... Harvard Business Review, (September-October). McCutcheon, G., & Jung, B. (1990). Alternative Perspectives on Action Research. Theory Into Practice, 29(3), 144-151. Ohtomi, K. (2005).Importance of Upstream Design in Product Development and Its Methodologies. Conference: Thermal, Mechanical and Multi-Physics Simulation and Experiments in Micro-Electronics and Micro-Systems. DOI:10.1109/ESIME.2005.1502763 Reguia, C. (2014). Product Innovation and the Competitive Advantage. European Scientific Journal, 10(10), 140-157.
Uchihira, N. (2007). Knowledge Processing Technologies for Service Innovation in the Manufacturing Sector. JOURNAL-JAPANESE SOCIETY FOR ARTIFICIAL INTELLIGENCE, 22(6), 754. Winner, R. I., Pennell, J. P., Bertrand, H. E., & Slusarczuk, M. M. (1988). The Role of Concurrent Engineering in Weapons System Acquisition (No. IDA-R-338). Institute for Defense Analyses Alexandria VA. Technology Readiness Assessment(TRA) Deskbook, July 2009. Manufacturing Readiness Level Deskbook, July 2009.
Koezuk, H,2018, 「半導体製造装置企業の競争環境とイノベーション戦略」, 立命館経営学,56(6),145 和田木哲哉・横山貴子著/ 奥村勝弥監修[2009]『徹底解析 半導体製造装置産業』工業調査会
|