|
[1] J. Blazewicz, J. K. Lenstra, and A. R. Kan, "Scheduling subject to resource constraints: classification and complexity," Discrete applied mathematics, vol. 5, no. 1, pp. 11-24, 1983. [2] W. Chen, Y.-j. Shi, H.-f. Teng, X.-p. Lan, and L.-c. Hu, "An efficient hybrid algorithm for resource-constrained project scheduling," Information Sciences, vol. 180, no. 6, pp. 1031-1039, 2010. [3] W.-C. Yeh, "A two-stage discrete particle swarm optimization for the problem of multiple multi-level redundancy allocation in series systems," Expert Systems with Applications, vol. 36, no. 5, pp. 9192-9200, 2009. [4] W.-C. Yeh, W.-W. Chang, and Y. Y. Chung, "A new hybrid approach for mining breast cancer pattern using discrete particle swarm optimization and statistical method," Expert Systems with Applications, vol. 36, no. 4, pp. 8204-8211, 2009. [5] R. Kolisch and A. Sprecher, "The Library PSBLIB," ed, 2012. [6] R. Kolisch and A. Sprecher, "PSPLIB-a project scheduling problem library: OR software-ORSEP operations research software exchange program," European journal of operational research, vol. 96, no. 1, pp. 205-216, 1997. [7] A. B. Badiru, Project management tools for engineering and management professionals. Industrial Engineering and Management Press, Institute of Industrial Engineers, 1991. [8] C. Artigues, S. Demassey, and E. Neron, Resource-constrained project scheduling: models, algorithms, extensions and applications. John Wiley & Sons, 2013. [9] R. L. Graham, E. L. Lawler, J. K. Lenstra, and A. R. Kan, "Optimization and approximation in deterministic sequencing and scheduling: a survey," in Annals of discrete mathematics, vol. 5: Elsevier, 1979, pp. 287-326. [10] E. L. Demeulemeester and W. S. Herroelen, Project scheduling: a research handbook. Springer Science & Business Media, 2006. [11] R. Kolisch and S. Hartmann, "Heuristic algorithms for the resource-constrained project scheduling problem: Classification and computational analysis," in Project scheduling: Springer, 1999, pp. 147-178. [12] B. Ashtiani, R. Leus, and M.-B. Aryanezhad, "A novel class of scheduling policies for the stochastic resource-constrained project scheduling problem," 2008. [13] O. Sinnen, L. A. Sousa, and F. E. Sandnes, "Toward a realistic task scheduling model," IEEE Transactions on Parallel and Distributed Systems, vol. 17, no. 3, pp. 263-275, 2006. [14] K. Nonobe and T. Ibaraki, "Formulation and tabu search algorithm for the resource constrained project scheduling problem," in Essays and surveys in metaheuristics: Springer, 2002, pp. 557-588. [15] K. Bouleimen and H. Lecocq, "A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version," European Journal of Operational Research, vol. 149, no. 2, pp. 268-281, 2003. [16] M. B. Wall, "A genetic algorithm for resource-constrained scheduling," Massachusetts Institute of Technology, 1996. [17] M. M. Nasiri, "A pseudo particle swarm optimization for the RCPSP," The International Journal of Advanced Manufacturing Technology, vol. 65, no. 5-8, pp. 909-918, 2013. [18] V. Valls, F. Ballestin, and S. Quintanilla, "A hybrid genetic algorithm for the resource-constrained project scheduling problem," European Journal of Operational Research, vol. 185, no. 2, pp. 495-508, 2008. [19] J. M. Wilson, "Gantt charts: A centenary appreciation," European Journal of Operational Research, vol. 149, no. 2, pp. 430-437, 2003. [20] W.-C. Yeh, "Orthogonal simplified swarm optimization for the series–parallel redundancy allocation problem with a mix of components," Knowledge-Based Systems, vol. 64, pp. 1-12, 2014. [21] W.-C. Yeh, "Optimization of the disassembly sequencing problem on the basis of self-adaptive simplified swarm optimization," IEEE transactions on systems, man, and cybernetics-part A: systems and humans, vol. 42, no. 1, pp. 250-261, 2012. [22] W.-C. Yeh, "Simplified swarm optimization in disassembly sequencing problems with learning effects," Computers & Operations Research, vol. 39, no. 9, pp. 2168-2177, 2012. [23] R. Kolisch, "Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation," European Journal of Operational Research, vol. 90, no. 2, pp. 320-333, 1996. [24] R. Kolisch, A. Sprecher, and A. Drexl, "Characterization and generation of a general class of resource-constrained project scheduling problems," Management science, vol. 41, no. 10, pp. 1693-1703, 1995. [25] R. Kolisch, "Efficient priority rules for the resource-constrained project scheduling problem," Journal of Operations Management, vol. 14, no. 3, pp. 179-192, 1996. [26] V. Valls, F. Ballestı́n, and S. Quintanilla, "Justification and RCPSP: A technique that pays," European Journal of Operational Research, vol. 165, no. 2, pp. 375-386, 2005. [27] K. Li and R. Willis, "An iterative scheduling technique for resource-constrained project scheduling," European Journal of Operational Research, vol. 56, no. 3, pp. 370-379, 1992. [28] W. p. Yang and Y. Tarng, "Design optimization of cutting parameters for turning operations based on the Taguchi method," Journal of materials processing technology, vol. 84, no. 1-3, pp. 122-129, 1998. [29] A. Andreica and C. Chira, "Best-order crossover in an evolutionary approach to multi-mode resource-constrained project scheduling," International Journal of Computer Information System and Industrial Management Applications, vol. 6, pp. 364-72, 2014. [30] N. Rahmani, V. Zeighami, and R. Akbari, "A study on the performance of differential search algorithm for single mode resource constrained project scheduling problem," Decision Science Letters, vol. 4, no. 4, pp. 537-550, 2015. [31] K. Ziarati, R. Akbari, and V. Zeighami, "On the performance of bee algorithms for resource-constrained project scheduling problem," Applied Soft Computing, vol. 11, no. 4, pp. 3720-3733, 2011. |