|
[1] 林則孟(2012),生產計劃與管理,華泰文化 [2] 顏嘉良(2016),探討投料、緩衝及瓶頸資源派工於半導體封裝製程,國 立清華大學工業工程與工程管理學系碩士論文 [3] 劉愛琳(2016),以穩健最佳化分析航班與卸載道之指派問題,國立清華大學 工業工程與工程管理學系碩士論文 [4] Amadeu, A. C., Andrea, C. S., & Thiago, F. N. (2015). Scenario-based heuristics with path-relinking for the robust set covering problem. The XI Metaheuristics International Conference. [5] Ben-Tal, A., El Ghaoui, L., & Nemirovski, A. (2009). Robust optimization. Princeton University Press. [6] Calfa, B. A., Agarwal, A., Grossmann, I. E., & Wassick, J. M. (2014). Data-driven multi-stage scenario tree generation via statistical property and distribution matching. Computers & Chemical Engineering, 68, 7-23. [7] Centeno, G., & Armacost, R. L. (1997). Parallel machine scheduling with release time and machine eligibility restrictions, Computers ind. Engng Vol, 33, Nos 1-2. pp. 273-276. [8] Cheng, C. Y., & Huang, L. W. (2017). Minimizing total earliness and tardiness through unrelated parallel machine scheduling using distributed release time control, Journal of Manufacturing Systems 42 1–10. [9] Christie, R. M., & David Wu, S. (2002). Semiconductor capacity planning: stochastic modeling and computational studies. Iie Transactions, 34(2), 131-143. [10] Fowler, J. W., Horng, S. M., & Jeffery K. (2003). A hybridized genetic algorithm to solve parallel machine scheduling problems with sequence dependent setups. International Journal of Industrial Engineering, 10(3). 232-243. [11] Graham, R. L., Lawler, E. L., Lenstra, J. K., & Kan, A. R. (1979). Optimization and approximation in deterministic sequencing and scheduling: a survey. Annals of discrete mathematics, 5, 287-326. [12] Guillén, G., Espuna, A., & Puigjaner, L. (2006). Addressing the scheduling of chemical supply chains under demand uncertainty. AIChE journal, 52(11), 3864-3881. [13] Hood, S. J., Bermon, S., & Barahona, F. (2003). Capacity planning under demand uncertainty for semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing, 16(2), 273-280. [14] Hu, H., Ng, K. K. H., & Qin, Y. (2016). Robust Parallel Machine Scheduling Problem with Uncertainties and Sequence-Dependent Setup Time, Scientific Programming, Volume 2016, Article ID 5127253, 13 pages. [15] Joo, C .M., & Kim, B. S. (2012). Parallel machine scheduling problem with ready times, due times and sequence-dependent setup times using meta-heuristic algorithms, Engineering Optimization, Vol.44, No.9, 1021-1034. [16] KURZ, M. E., & ASKIN, R. G. (2001). Heuristic scheduling of parallel machines with sequence-dependent set-up times, Int. J. Prod. Res., vol. 39, no. 16, 3747-3769. [17] Leung, S. C. H., & Wu, Y. (2004). A robust optimization model for stochastic aggregate production planning, Production Planning & Control Vol. 15, No. 5, 502–514. [18] Liao, L. W., & Sheen, G. J. (2008). Parallel machine scheduling with machine availability and eligibility constraints, European Journal of Operational Research 184, 458–467. [19] McCormick, S. T., & Pinedo, M. L. (1995). Scheduling n independent jobs on m uniform machines with both flowtime and makespan objectives: a parametric analysis. ORSA Journal on Computing, 7(1), 63-77. [20] Mulvey, J. M., Vanderbei, R., & Zenios, S. A. (1995). Robust Optimization of Large-Scale Systems, Operations Research, Vol. 43, No.2, 264-281. [21] Nasr A. H., & ElMekkawy, T. Y. (2011). Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm, Int. J. Production Economics 132 279–291. [22] Pereira, J., & Averbakh, I. (2011). Exact and heuristic algorithms for the interval data robust assignment problem, Computers & Operations Research 38 1153–1163. [23] Piersma, N., & Dijk, W. V. (1996). A Local Search Heuristic for Unrelated Parallel Machine Scheduling with Efficient Neighborhood Search, Mathl. Comput. Modelling Vol. 24, No. 9, pp. 11-19. [24] Sevaux, M., & Sörensen, K. (2002, April). Genetic algorithm for robust schedules. In 8th International Workshop on Project Management and Scheduling (PMS 2002) (pp. 330-333). [25] Vallada, E., & Ruiz, R. (2011). A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times, European Journal of Operational Research 211 612–622. [26] Wu, L., Shahidehpour, M., & Li, Z. (2012). Comparison of scenario-based and interval optimization approaches to stochastic SCUC. IEEE Transactions on Power Systems, 27(2), 913-921. [27] Xu, X., Cui, W., Lin, J., & Qian, Y. (2013). Robust makespan minimisation in identical parallel machine scheduling problem with interval data, International Journal of Production Research, Vol. 51, No. 12, 3532–3548. [28] Yalaoui, F., & Chu, C. (2003). An efficient heuristic approach for parallel machine scheduling with job splitting and sequence-dependent setup times. IIE Transactions, 35(2), 183-190. [29] Yu, C. S., & Li, H. L. (2000). A robust optimization model for stochastic logistic problems, Int. J. Production Economics 64 385-397.
|