|
[1] 陳建良(1995),排程概述,機械工業雜誌,第12月號,頁122-137 [2] 鍾淑馨,謝志銘(1996),限制資源有限前推排程法之設計,工業工程學刊,第十三卷,第一期,頁23-33 [3] 吳鴻輝,林則孟,吳凱文(1999),限制驅導式管理系统於半導體封装廠之應用,工業工程學刊,第十六卷,第一期,頁13-37 [4] 林則孟(2001),系統模擬-理論與應用,滄海書局 [5] 吳鴻輝(2001),限制驅導式現場排程與管理技術,全華 [6] 朱仲威(2007),以反應曲面法及模擬模式求解多目標推拉界限決策-以 TFT-LCD 後段製程為例,成功大學製造工程研究所學位論文,頁1-98 [7] 林育成(2009),以在製品統計製程管制法改善晶圓代工廠生產週期之研究,兩岸機電暨產學合作學術研討會論文集 [8] 鍾雅琳(2014),考量派工法則與批量流於半導體封裝廠之生產排程問題,國立清華大學工業工程與工程管理學系碩士論文 [9] Blackstone, J. H., Phillips, D. T., & Hogg, G. L. (1982). A state-of-the-art survey of dispatching rules for manufacturing job shop operations. The International Journal of Production Research, 20(1), 27-45. [10] Browne, J., Dubois, D., Rathmill, K., Sethi, S. P., & Stecke, K. E. (1984). Classification of flexible manufacturing systems. The FMS magazine, 2(2), 114-117. [11] Cachon, G. P., & Lariviere, M. A. (1999). An equilibrium analysis of linear, proportional and uniform allocation of scarce capacity. Iie Transactions, 31(9), 835-849. [12] Chen, C.-H., Lin, J., Yücesan, E., & Chick, S. E. (2000). Simulation budget allocation for further enhancing the efficiency of ordinal optimization. Discrete Event Dynamic Systems, 10(3), 251-270. [13] Crittenden, V. L. (1992). Close the marketing/manufacturing gap. Sloan Management Review, 33(3), 41. [14] Dudewicz, E. J., & Dalal, S. R. (1975). Allocation of observations in ranking and selection with unequal variances. Sankhyā: The Indian Journal of Statistics, Series B, 28-78. [15] Glassey, C. R., & Resende, M. G., (1988). Closed-loop job release control for VLSI circuit manufacturing. IEEE Transactions on Semiconductor manufacturing, 1(1), 36-46. [16] Glassey, C. R., & Resende, M. G., (1988). A scheduling rule for job release in semiconductor fabrication. Operations Research Letters, 7(5), 213-217. [17] Goldratt, Eliyahu M. (1990). What is this thing called theory of constraints and how should it be implemented?. North river press. [18] Haupt R. (1989). A Survey of Priority Rule-Based Scheduling, OR Spektrum 11:3--16. [19] Henderson, S. G., & Nelson, B. L. (2006). Handbooks in Operations Research and Management Science: Simulation: Simulation , vol.13, Elsevier. [20] Hunsucker J.L. and Shah, J.R. (1994). Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment, European Journal of Operational Research ,vol.72, 102-114. [21] Kim, K. H., & Egbelu, P. J. (1999). Scheduling in a production environment with multiple process plans per job. International Journal of Production Research, 37(12), 2725-2753. [22] Matejcik, F. J., & Nelson, B. L. (1993). Simultaneous ranking, selection and multiple comparisons for simulation. Paper presented at the Proceedings of the 25th conference on Winter simulation. [23] Olhager, J., & Östlund, B. (1990). An integrated push-pull manufacturing strategy. European Journal of Operational Research, 45(2-3), 135-142. [24] Rinott, Y. (1978). On two-stage selection procedures and related probability-inequalities. Communications in Statistics-Theory and methods, 7(8), 799-811. [25] Russell, G. R., & Fry, T. D. (1997). Order review/release and lot splitting in drum-buffer-rope. International journal of production research, 35(3), 827-845. [26] Sarper, H. and Henry, MC. (1996). Combinatorial dispatching rules in a two-machine flow evaluation of six dynamic shop, Omega, Vol. 24, No. 1, 73-81. [27] Schragenheim, E., Weisenstern, A., & Schragenheim, A. (2006). What’s really new in Simplified DBR. In TOC ICO Conference. [28] Schragenheim, E., & Dettmer, H. W. (2000). Simplified drum-buffer-rope a whole system approach to high velocity manufacturing. Goal Systems International. [29] Spearman, M. L., Woodruff, D. L., & Hopp, W. J. (1990). CONWIP: a pull alternative to kanban. The International Journal of Production Research, 28(5), 879-894. [30] Spearman, M. L., & Zazanis, M. A. (1992). Push and pull production systems: issues and comparisons. Operations research, 40(3), 521-532. [31] Taylor III, L. J. (1999). A simulation study of WIP inventory drive systems and their effect on financial measurements. Integrated Manufacturing Systems, 10(5), 306-315. [32] Tsubone, H., & Horikawa, M. (1999). A comparison between machine flexibility and routing flexibility. International Journal of Flexible Manufacturing Systems, 11(1), 83-101. [33] Wang, I. L., Yang, T., & Chang, Y. B. (2012). Scheduling two-stage hybrid flow shops with parallel batch, release time, and machine eligibility constraints. Journal of Intelligent Manufacturing, 1-10. [34] Wein, L. M. (1988). Scheduling semiconductor wafer fabrication. IEEE Transactions on semiconductor manufacturing, 1(3), 115-130. [35] Xiong, G., & Nyberg, T. R. (2000). Push/pull production plan and schedule used in modern refinery CIMS. Robotics and Computer-integrated manufacturing, 16(6), 397-410. [36] Yang, T., Kuo, Y., & Cho, C. (2007). A genetic algorithms simulation approach for the multi-attribute combinatorial dispatching decision problem. European Journal of Operational Research, 176(3), 1859-1873. |