|
[1] U.S. NRC, “TRACE V5.840 User’s Manual Volume 2: Modeling Guidelines,” 2014. [2] T. J. Downar, Y. Xu, andV. Seker, “PARCS v3.0 U.S. NRC Core Neutronics Simulator USER MANUAL,” 2013. [3] Jose Reyes, “Natural Circulation in Water Cooled Nuclear Power Plants Phenomena, models, and methodology for system reliability assessments,” Idaho Falls, ID, Feb.2005. doi: 10.2172/836896. [4] U.S. NRC, “TRACE V5.840 User’s Manual Volume 1: Input Specification,” 2014. [5] 李京翰, “核一廠 TRACE 模式的建立與驗證,” 國立清華大學核子工程與科學所碩士論文, 2009. [6] 施純寬, “核電廠系統安全分析應用程式金山核電廠TRACE之模式建立與驗證,” 核能研究所委託研究報告, 2012. [7] J. R. Wang, H. T. Lin, W. C. Wang, S. C. Chen, and C. Shih, “Trace models and verifications for lungmen ABWR,” Trans. Am. Nucl. Soc., 2009. [8] J. R. Wang, H. T. Lin, Y. H. Cheng, W. C. Wang, and C. Shih, “TRACE modeling and its verification using Maanshan PWR start-up tests,” Ann. Nucl. Energy, vol. 36, no. 4, pp. 527–536, May2009, doi: 10.1016/j.anucene.2008.12.017. [9] J. H. Yang, J. R. Wang, H. T. Lin, and C. Shih, “LBLOCA analysis for the Maanshan PWR nuclear power plant using TRACE,” Energy Procedia, vol. 14, pp. 292–297, 2012, doi: 10.1016/j.egypro.2011.12.932. [10] Y. H. Cheng, J. R. Wang, H. T. Lin, and C. Shih, “Benchmark calculations of pressurizer model for Maanshan nuclear power plant using TRACE code,” Nucl. Eng. Des., vol. 239, no. 11, pp. 2343–2348, Nov.2009, doi: 10.1016/j.nucengdes.2009.07.025. [11] P. Kral, “Advantages of Complex and Detailed Modeling of RCS-Containment-ECCS Systems in Single TH Analysis,” in CAMP Meeting, Stockholm, 2010, pp. 1–34. [12] F. D. Auria et al., “QUALIFICATION AND APPLICATION OF COUPLED REACTOR COOLING SYSTEM AND CONTAINMENT NODALISATIONS,” in IAEA TECHNICAL MEETING, VIENNA, 2003, pp. 1–23. [13] J. Kim and Y. Bang, “Development of RCS-Containment Coupled Analysis Model and Evaluation of LBLOCA for APR-1400,” in 26th International Conference Nuclear Energy for New Europe, BLED, 2017, pp. 220.1-220.8. [14] L. Ge, Z. Yang, J. Shan, H. Li, and D. Liu, “Three-dimensional transient analysis of coupled RCS-containment integral system,” Nucl. Eng. Des., vol. 359, p. 110461, Apr.2020, doi: 10.1016/j.nucengdes.2019.110461. [15] T. Kozlowski, R. M. Miller, T. J. Downar, D. A. Barber, and H. G. Joo, “Consistent Comparison of the Codes RELAP5/PARCS and TRAC-M/PARCS for the OECD MSLB Coupled Code Benchmark,” Nucl. Technol., vol. 146, no. 1, pp. 15–28, Apr.2004, doi: 10.13182/NT04-A3483. [16] D. Lee, T. J. Downar, A. Ulses, B. Akdeniz, and K. N. Ivanov, “Analysis of the OECD/NRC BWR Turbine Trip Transient Benchmark with the Coupled Thermal-Hydraulics and Neutronics Code TRAC-M/PARCS,” Nucl. Sci. Eng., vol. 148, no. 2, pp. 291–305, Oct.2004, doi: 10.13182/NSE04-A2459. [17] A. Bousbia-Salah, J. Vedovi, F. D’Auria, K. Ivanov, and G. Galassi, “Analysis of the Peach Bottom Turbine Trip 2 Experiment by Coupled RELAP5-PARCS Three-Dimensional Codes,” Nucl. Sci. Eng., vol. 148, no. 2, pp. 337–353, Oct.2004, doi: 10.13182/NSE04-A2462. [18] L. Y. Cheng, J. S. Baek, A. Cuadra, A. Aronson, D. Diamond, and P. Yarsky, “TRACE simulation of BWR anticipated transient without scram leading to emergency depressurization,” in Embedded Topical Meeting on Advances in Thermal Hydraulics, ATH 2014, Held at the American Nuclear Society 2014 Annual Meeting, 2014, pp. 738–753. [19] H. T. Lin, J. R. Wang, H. C. Chen, and C. Shih, “The development and assessment of TRACE/PARCS model for Lungmen ABWR,” Nucl. Eng. Des., vol. 273, pp. 241–250, Jul.2014, doi: 10.1016/j.nucengdes.2014.03.027. [20] M. A. Elsawi and A. S. B. Hraiz, “Benchmarking of the WIMS9/PARCS/TRACE code system for neutronic calculations of the Westinghouse AP1000TM reactor,” Nucl. Eng. Des., vol. 293, pp. 249–257, 2015, doi: 10.1016/j.nucengdes.2015.08.008. [21] F. Mascari and G. Vella, “Analyses of Trace-Parcs Coupling Capability,” in Nuclear Energy for New Europe 2011, Bovec, 2011, pp. 816.1-816.9. [22] Y. Alzaben, V. H. Sanchez-Espinoza, and R. Stieglitz, “Analysis of a steam line break accident of a generic SMART-plant with a boron-free core using the coupled code TRACE/PARCS,” Nucl. Eng. Des., vol. 350, no. February, pp. 33–42, 2019, doi: 10.1016/j.nucengdes.2019.05.002. [23] R. A. Busquim e Silva, K. Shirvan, J. J. Cruz, R. P. Marques, A. L. F. Marques, and J. R. C. Piqueira, “Advanced method for neutronics and system code coupling RELAP, PARCS, and MATLAB for instrumentation and control assessment,” Ann. Nucl. Energy, vol. 140, p. 107098, 2020, doi: 10.1016/j.anucene.2019.107098. [24] Y. Xu, T. Downar, R. Walls, K. Ivanov, J. Staudenmeier, and J. March-Lueba, “Application of TRACE/PARCS to BWR stability analysis,” Ann. Nucl. Energy, vol. 36, no. 3, pp. 317–323, 2009, doi: 10.1016/j.anucene.2008.12.022. [25] T. Kozlowski et al., “TRACE/PARCS analysis of the OECD/NEA Oskarshamn-2 BWR stability benchmark,” in International Conference on the Physics of Reactors 2012, PHYSOR 2012: Advances in Reactor Physics, 2012, p. 1. [26] 張佳穎, “龍門電廠TRACE/PARCS模式建立與應用,” 國立清華大學核子工程與科學研究所碩士論文, 2012. [27] 台灣電力公司, “金山電廠訓練教材,Revision 6,” 2003. [28] U.S. NRC, “Reactor Concepts Manual Boiling Water Reactor Systems.” [Online]. Available: https://www.nrc.gov/docs/ML1209/ML120970422.pdf. [29] Applied Programming Technology Inc., “Symbolic Nuclear Analysis Package (SNAP) User’s Manual,” 2012. [30] U.S. NRC, “TRACE V5.840 Theory Manual,” 2013. [31] H. C. No, K.W.Lee, and C .Song, “AN EXPERIMENTAL STUDY ON AIR-WATER COUNTERCURRENT FLOW LIMITATION IN THE UPPER PLENUM WITH A MULTI-HOLE PLATE,” Nucl. Eng. Technol., vol. 37, no. 6, pp. 557–564, 2005. [32] Y. Xu and T. Downar, “GenPMAXS Code for Generating the PARCS Cross Section Interface File PMAXS,” 2005. [33] Taiwan Power Company, “Final Safety Analysis Report, Chinshan Nuclear Power Station Unit 1&2 (FSAR),” 2000. [34] Y. S. Chen, Y. R. Yuann, L. C. Dai, and Y. P. Lin, “Pressure and temperature analyses using GOTHIC for Mark I containment of the Chinshan Nuclear Power Plant,” Nucl. Eng. Des., vol. 241, no. 5, pp. 1548–1558, May2011, doi: 10.1016/j.nucengdes.2011.02.004. [35] J. J. Huang, H. C. Chen, J. R. Wang, L. Y. Liao, H. T. Lin, and C. Shih, “The Load Rejection Transient Analysis of Chinshan NPP (BWR/4) Using TRACE/PARCS,” in 22th International Conference on Nuclear Engineering, 2014, p. 30858. [36] J. R. Wang, H. T. Lin, H. C. Chen, and C. Shih, “The Establishment and Assessment of Chinshan ( BWR / 4 ) Nuclear Power Plant,” NUREG/IA-0445, 2014. [37] J. J. Huang, J. R. Wang, C. Shih, S. W. Chen, L. Y. Liao, and H. T. Lin, “The Establishment and Analysis of TRACE Model for Ultimate Response Guideline of Chinshan Nuclear Power Plant,” in ICAPP 2015, 2015, p. 15445. [38] U.S. Code of Federal Regulation, “Title 10, Part 50.46, Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors.” USA, 2007. [39] U.S. NRC, “Standard Review Plan,” 2007. [40] C. Y.Chen, C. Shih, and J. R. Wang, “The alternate mitigation strategies on the extreme event of the LOCA and the SBO with the TRACE Chinshan BWR4 model,” Nucl. Eng. Des., vol. 256, pp. 332–340, Jan.2013, doi: 10.1016/j.nucengdes.2012.08.029. [41] K. Nikitin, P. Mueller, J. Martin, W. VanDoesburg, and D. Hiltbrand, “BWR-4 LOCA modeling with RELAP5,” in International Topical Meeting on Nuclear Reactor Thermal Hydraulics 2015, NURETH 2015, 2015, p. 1. [42] K. Nikitin, P. Mueller, J. Martin, W. vanDoesburg, and D. Hiltbrand, “BWR loss of coolant accident simulation by means of RELAP5,” Nucl. Eng. Des., vol. 309, pp. 113–121, Dec.2016, doi: 10.1016/j.nucengdes.2016.09.008. [43] Y. S. Chen, Y. R. Yuann, Y. P. Lin, and L. C. Dai, “Thermal-Hydraulic Analysis of Mark I Containment of the Chinshan Nuclear Power Plant with GOTHIC,” in Nuthos-8, 2010, no. N8P0145, pp. 1–12. [44] Y. R. Yuann, “Alternative cooling water flow path for RHR heat exchanger and its effect on containment response during extended station blackout for Chinshan BWR-4 plant,” Nucl. Eng. Des., vol. 300, pp. 403–411, 2016, doi: 10.1016/j.nucengdes.2016.02.016. [45] Taiwan Power Company, “Chinshan Nuclear Power Station Units 1 and 2 Final Safety Analysis Report,” 2008. [46] 苑穎瑞, 許耕獻, 林金足, “核一廠承受電廠全黑 24 小時之能力評估,” 核能研究所, INER-11174I. 2014. [47] U.S. Code of Federal Regulation, “Title 10, Part 50.2, Definitions.” USA, 2014. [48] U.S. Code of Federal Regulation, “Title 10, Part 50.63, Loss of All Alternating Current power.” USA, 2021. [49] Management, Nuclear Council, Resources, “Guideline and Technical bases for NUMARC Initiatives Addressing Station Blackout at light Water Reactors,” 1991. [50] American Nuclear Society, ANSI/ANS-5.1-1979: Decay Heat Power in Light Water Reactors, Revision 3. 1975. [51] NEI and the BWROG, “BWR Containment Venting Rev 1,” 2013. [52] IAEA, “The Fukushima Daiichi Accident: Emergency Preparedness and Response,” 2015. [53] BWR Owners’ Group, “Emergency Procedure and Severe Accident Guidelines,” 2013. [54] B. Williamson, J. Lyter, D. Roniger, and P. Ellison, “Revising BWR emergency procedures,” 2013. [55] Taiwan Power Company, “Ultimate Response Guideline for Chinshan Nuclear Power Plant,” 2014. [56] M. A. Feltus, “Coupled 3-D kinetics thermal-hydraulic analysis of Hot Zero Power main steam line breaks using RETRAN and STAR codes,” Nucl. Eng. Des., vol. 146, no. 1–3, 1994, doi: 10.1016/0029-5493(94)90349-2. [57] K. N. Ivanov, N. K. Todorova, and E. Sartori, “Using the OECD/NRC Pressurized Water Reactor Main Steam Line Break Benchmark to Study Current Numerical and Computational Issues of Coupled Calculations,” Nucl. Technol., vol. 142, no. 2, pp. 95–115, May2003, doi: 10.13182/NT03-A3376. [58] B. D. Ivanov et al., “OECD/DOE/CEA VVER-1000 coolant transient (V1000CT) benchmark – A consistent approach for assessing coupled codes for RIA analysis,” Prog. Nucl. Energy, vol. 48, no. 8, pp. 728–745, Nov.2006, doi: 10.1016/j.pnucene.2006.06.002. [59] Y. Kozmenkov, S. Kliem, U. Grundmann, U. Rohde, and F. P. Weiss, “Calculation of the VVER-1000 coolant transient benchmark using the coupled code systems DYN3D/RELAP5 and DYN3D/ATHLET,” Nucl. Eng. Des., vol. 237, no. 15-17 SPEC. ISS., 2007, doi: 10.1016/j.nucengdes.2007.02.021. [60] S. Kliem, S. Danilin, A. Hämäläinen, J. Hádek, A. Keresztúri, and P. Siltanen, “Qualification of Coupled 3-D Neutron-Kinetic/Thermal-Hydraulic Code Systems by the Calculation of Main-Steam-Line-Break Benchmarks in an NPP with VVER-440 Reactor,” Nucl. Sci. Eng., vol. 157, no. 3, pp. 280–298, Nov.2007, doi: 10.13182/NSE07-A2728. [61] T. Vanttola et al., “Validation of coupled codes using VVER plant measurements,” Nucl. Eng. Des., vol. 235, no. 2–4, pp. 507–519, Feb.2005, doi: 10.1016/j.nucengdes.2004.08.047. [62] A. Hämäläinen et al., “Validation of coupled neutron kinetic/thermal-hydraulic codes. Part 2: Analysis of a VVER-440 transient (Loviisa-1),” Ann. Nucl. Energy, vol. 29, no. 3, pp. 255–269, Feb.2002, doi: 10.1016/S0306-4549(01)00039-1. [63] S. Mittag et al., “Validation of coupled neutron kinetic/thermal–hydraulic codes. Part 1: Analysis of a VVER-1000 transient (Balakovo-4),” Ann. Nucl. Energy, vol. 28, no. 9, pp. 857–873, Jun.2001, doi: 10.1016/S0306-4549(00)00095-5. [64] U. Grundmann, S. Kliem, and U. Rohde, “Analysis of the Boiling Water Reactor Turbine Trip Benchmark with the Codes DYN3D and ATHLET/DYN3D,” Nucl. Sci. Eng., vol. 148, no. 2, pp. 226–234, Oct.2004, doi: 10.13182/NSE04-A2453. [65] U.S. NRC, “TRACE V5.0 ASSESSMENT MANUAL Main Report,” 2008. [Online]. Available: https://www.nrc.gov/docs/ML1200/ML120060208.pdf. [66] T. Downar, Y. Xu, and V. Seker, “PARCS v3.0 U.S. NRC Core Neutronics Simulator Theory Manual,” 2012. [67] T. C. Cohen, and G. V. Kumar, “Chins Han Unit 1 Startup Test Results Final Summary Report.,” 1979. [68] J. R. Tang, “QUALIFICATION OF THE BEST-ESTIMATE CHINSHAN BWR/4 RETRAN-3D MODEL,” 2003. [69] H. S. Cheng, D. J.Diamond, and M.S. Lu, “Boiling Water Reactor Scram Reactivity Characteristics,” Nucl. Technol., vol. 37, no. 3, pp. 246–260, Mar.1978, doi: 10.13182/NT78-A31993. [70] S. S. Ma, S. S. Hsu, and Y. S. Chen, “Scram speed assessment for transient analysis in Chinshan BWR-4 Plant,” Ann. Nucl. Energy, vol. 88, pp. 30–40, Feb.2016, doi: 10.1016/j.anucene.2015.10.018. [71] J. March-Leuba and P. J. Otaduy, “Comparison of BWR-stability measurements with calculations using the code LAPUR-IV,” Oak Ridge National Lab., TN (USA), 1983. [72] J. March-Leuba and E. D. Blakeman, “A Mechanism for Out-of-Phase Power Instabilities in Boiling Water Reactors,” Nucl. Sci. Eng., vol. 107, no. 2, pp. 173–179, Feb.1991, doi: 10.13182/NSE91-A15730. [73] 曾文煌, “LASALLE-2沸水式反應爐熱流不穩定性事件,” 台電核能月刊, vol. 6, pp. 50–57, 1990. [74] P. HANGGI, “Investigating BWR stability with a new linear frequency-domain method and detailed 3D neutronics,” SWISS FEDERAL INSTITUTE OF TECHNOLOGY ZURICH. 2001. [75] J. W. Magedanz, “Development of Model of Oskarshamn-2 Reactor for Assessment of TRACE/PARCS for Boiling Water Reactor Stability Analysis,” The Pennsylvania State University, 2010. [76] 黃志中, 陳紹文, 施純寬, 王仲容, 廖俐毅, 林浩慈, “金山核電廠斷然處置措施TRACE模式建立與分析,” 中國機械工程學會第三十一屆全國學術研討會, 台中, 2014, pp. 1–6. [77] J. J. Huang, S. W. Chen, J. R. Wang, C. Shih, and H. T. Lin, “LOCA analysis of BWR-4/Mark-I nuclear power plant with TRACE,” Kerntechnik, vol. 86, no. 2, pp. 128–142, Apr.2021, doi: 10.1515/KERN-2020-0065. [78] J. J.Huang, S. W. Chen, J. R. Wang, C. Shih, H. T. Lin, and C. K. Chen, “The evaluation of TRACE/PARCS model for BWR-4 nuclear power plant by startup test transient analyses,” Kerntechnik, vol. 86, no. 5, pp. 353–364, Oct.2021, doi: 10.1515/kern-2021-0009. |